Catalina Aquarium

YOUR #1 SOURCE FOR AQUARIUM, HYDROPONICS, AND REPTILE LIGHTING SOLUTIONS

Home > Lighthouse and Solar Legs Installation Instructions
Lighthouse and Solar Legs Installation Instructions  HEADING_TITLE

Lighthouse and Solar Legs Installation Instructions

Lighthouse and Solar Leg Kit

The Legs kit comes with 2 right legs ("R" stamped on the right legs) and two left legs ("L" stamped on the left legs), four track guides, and four screws.

Slide into groove.Slide Track Guide in groove on front or back side of light.Use phillips screw driver to tighten.

On front and back side of the Lighthouse and Solar hood is a groove that the track guide slides into. Slide one of the track guides in to a groove to get proper orientation of the track guide. Place a screw through the flat side of one of the legs. Remove the track guide from the side of the light housing and place the side that was facing you against the backside of the leg. Tighten the screw in to track guide just enough to hold on the leg (to tight and you wont be able to slide the track guide into the groove).

Angle Track Guide in groove on front or back side of light.Leg installed on Solar hood.

For the Lighthouse hood Slide the track guide into the grove, for the Solar hood angle the track guide into the groove, then tighten with a phillips screw driver enough to hold the leg firmly in place.

Leg installed on Solar hood above aquarium.

Once all four legs are mounted loosen the legs just enough so they can be adjusted to match the width of the tank. Tighten all four legs enough so they are firmly locked in place.

Silkroad Consulting